Date:
6/12/2025
Type:
Work Progress
Subject:
Projects <> Mark
Notes:
Agenda – Mark Projects
1. Project Review Board
2. Moovila Adoption Updates/Action Items
a. Currently looking at End Dates
i. Need more End Date updates (needs to be updated in both systems)
b. Currently looking at Critical Paths on active projects
i. Asked him to slate out time this week for this more.
ii. He did this.
3. Projects that are closing next 7-10 days (this week or next)
a. Autobarn Imports – Windows updates – bumping to next week
b. Lucid 1pm Thursday for the close out meeting
c. Loeber – Project survey sent – needs a docusign
d. Doland – OneDrive Sync project completed
4. Resource Management
a. Wes is out the week of June 16th.
b. Doug has 2 weeks back to back last week of June/July
c. Ethan out half day this Friday the 13th
5. Mark Goals for this week (6/9/2025)
a. Study for Project+ for the 25th scheduled (did the bootcamp) – studied every night. Running through 100 questions a day
b. Project quoting procedure to finalize a process before next team meeting (2 weeks) – spent some time on it this week
c. Need Quotes (“Quotes Requested”) built out more – a list that are needing to get out by priority – get them to Rick – moves to “Quote in Progress”
i. Loeber & Autobarn & DWG Lexus – waiting on David – received – just need build it now
ii. Refast switch quote – Jason replied back today to Doug’s questions
iii. Autobarn – used cars expansion – got it from David – sending over to Vivian.
iv. DWG – Quote is done and sent to Chris
Notes:
Lucid – should be finished Thursday at 1pm – got managed switch paperwork sent over – was questioned today – and discussed
Autobarn LTD – Mazda – PC Refresh/End Point management – 8 machines next
Community Honda – approved Pc refresh – discussed next steps – Tom and Mark making plan.
Shartega – UPS received –
Doland – UPS not delivered – apparently it was not received – received everything except the actual UPS – Still can’t provide a reason for outage or fix – known issue – trying to get more issue related to sync issue – wanting to give customer comfort that this won’t be a normal happening – not getting good answer on it. – Close up the sync project.
Autobarn – Everything is cut over now – got the virtual machine for the keeper/key system working. Ethan is going through the list of PCs to 7 machines left to migrate. Some predecessor issues are needed for some of these 7 (such as iPads going into place – so the machine can be trickled) – discussing some with Vivian on Shirley’s machine – etc. home vs dealership – maybe a dock/station/laptop vs a desktop. Vivian approved Pandora media player this week.
Autobarn Imports – Windows upgrades likely to be done this weeks – The machines not taking the updates – CTV-finance02;CTV-salesmgr07,CTV-conf01, ctv-gfisher, LPT-ljanhnk01 – cts-tech05;cts-tech12,cts-inv01; cts-tech11 – some can’t be updated due to storage – some aren’t downloading correctly – some are not online. Wanson – may need to free up/delete space on those machine – temp/msi installers/etc.
Exchange – Zack buying his own Meraki gear vs. buying from us – no movement on this needs to be discussed at some point.
There are some quotes waiting on follow ups – Mark has been working those since our last call.
Laura w/ Survey & Sign off – Sign off is done. Followed up again – still nothing – aren’t being helpful
Loeber – should be getting sign off & survey.
Action Items:
In-Line
Completed by: George Fassett